Yesterday I had to stop work on installing the legs since one of my 12 volt batteries had to be recharged. I use two to create the 24 volts needed to release the Globe motor brake. Once I had that done, I was able to rotate the shoulder hub to the desired position.
I also dug out the R&J dome and placed that back on the frame. R2 is looking sharp!
Next up will be to work on the skins and center vents.